Join today and be a part of the fastest growing B2B Network Join Now

Table Formwork/Early Stripping Formwork/Slab Formwork/Post Tension Formwork/PT Slab Formwork/

  • Origin: China
  • Supply Type: oem service

Supplier Info.

  • Employees Total 11-50
  • Annual Revenue US$1 Million - US$2.5 Million

Table Formwork is a fast and safe system for the buildings with early stripping mechanism.

Here are the advantages of this system:

  • 1.Fast: one worker can achieve 100m2 one day
  • 2.Long duration: the bamboo plywood could be used 30-50 times
  • 3.Early stripping: after casting and the concrete strength reaches 13MPa, then remove the panels
  • 4.Easy to handle: the worker can learn in a few minutes.
  • 5.Reduce the cost: unlike the local plywood only 5-10 times duration, our formwork system can be used from 30-50 times.
  • The formwork system contains 3 basic components:
  • 1.The panel:
  • Plywood type: Bamboo plywood (Recycle times: At least 30 times)
  • Frame material: Steel Q235, Frame and plywood connected by rivets
  • Surface treatment: Panel Frame Rails Powder Coated Orange
  • Size: Max size 1.8m*1.2m, Min 0.6m*0.6m
  • Weight: Max 43kg/1.8m*1.2m, Min 13kg/0.6m*0.6m
  • If the bamboo plywood is broken, you can remove the rivets and then replace a new plywood.
  • 2.The prop/shoring system:
  • With early stripping head. Steel material, duration more than 5 years;
  • Height 2.2m to 3.5m;
  • Tube Thickness 3mm;
  • With extensions, the prop can reach 5.5m;
  • the load capcity of the prop is showed below:
  • 3.The infill beam for the area around the column, wall, beam etc.
  • Hang on the prop;
  • Available working with traditional formwork,thickness 12mm;
  • Duration more than 3 years.
  • 4.Cantilever and its related items for boundary installation of formwork
  • Projects references
Premium Services
Need Suppliers
Girl Right
Cross Popup
Arrow 2

I Am :

Signup today to claim your Discount. Get Started before it's too late!

Arrow 1