1. Net 35MW of electricity 2. Boiler to handle 30 tonnes of Dry (less than 10% MC) Baled agricultural waste per hour 3. 2 x 17.5 MW turbines should be cons*** with 1, 000, 000 lbs of steam per day going to manufacturing process 5. Exhaust air cleaning system should be cons Entire plant foot print ( Show More...
1. Net 35MW of electricity 2. Boiler to handle 30 tonnes of Dry (less than 10% MC) Baled agricultural waste per hour 3. 2 x 17.5 MW turbines should be cons*** with 1, 000, 000 lbs of steam per day going to manufacturing process 5. Exhaust air cleaning system should be cons Entire plant foot print (land area occupied should be cons. Mechanised semi automatic feed system should be cons Please give the costs in USD