Dear SirWe need to lift Mustard Husk and groundnut shell with a capacity of 4-5 MT per hr. From the ground level to 13 mtr height. Bulk density of the material to be lifted is 300-600 kg per m3This system is required for fuel handling in the Boiler House.Boiler house layout the attached for your ready referneceHoping for an Show More...
Dear SirWe need to lift Mustard Husk and groundnut shell with a capacity of 4-5 MT per hr. From the ground level to 13 mtr height. Bulk density of the material to be lifted is 300-600 kg per m3This system is required for fuel handling in the Boiler House.Boiler house layout the attached for your ready referneceHoping for an early and favourable response,RegardsRahul Agarwal