HUTUBI overland conveyor system design invitation 1, Project location: Hutubi, Xinjiang province; 2, Project design subject: 126km overland conveyor system design 3,Project purpose: 3.1 Convey ability design is 30 million Ton/year to fulfill local market demand in 2015. 3.2 Solving the key problem to convey the coal outside of mountain valley. 3.3 Reducing the land freight of convey from 50 RMB/T to 40 RMB/T, that will save the land freight 300 million RMB per year. 3.4 Using conveyor system to instead of traditional truck convey method to reduce the petrol loss and avoiding dust pollution, as well as protect our environment. 4, The construction of conveyor: the main conveyor line will be about 60km, and around the 60 km main conveyor line located 17 big or small coal mines. 5,Cooperation model: EPCO( Engineering, produce, construction and operation). Show More